|
![]() |
||
|
|
|
Districtwide
Miscellaneous Design and
Right of Way Surveying and Mapping This 24-month project for District Five covering ten counties
in the Central Florida area included design and right-of-way surveying;
ground control and global positioning system (GPS) surveys and target
control for aerial mapping; cross sections; profiles; topographic surveys
to supplement aerial mapping and for engineering design; utility location
surveys; drainage surveys; and right-of-way control surveys and drawings. |