Bridge Widenings and Replacements Marion County, Florida This project involved replacing three existing bridges and widening six others. All of the bridge construction had to be performed while maintaining two lanes of traffic in each direction on I-75. This required detailed construction phasing plans. The bridge replacements required extensive use of soil anchored
sheet pile retaining walls to accommodate the phased construction of these
bridges. Also, existing structures were analyzed for the changes in design
loads due to the widenings. Utility adjustment plans were also included.
|