|

|
|
City
of Mount Dora, Florida
DRMP has been providing a broad range
of engineering services to the City of Mount Dora since 1992 as a continuing
General Engineering Consultant. These services include traffic, stormwater,
water and wastewater utilities, general civil, environmental, survey,
and structural engineering projects. The following represents a summary
of the projects with which DRMP has been involved as a part of our continuing
contract:
- Gilbert Park Stormwater Master Plan
- Gilbert Park Paving and Drainage Improvements
- 6th Avenue Drainage Improvements (Phase I & Phase
II)
- Donnelly Street Parking Garage
- Donnelly Park
- Codding Property Stormwater Management System
- Reclaimed Water System Feasibility Study
- Waterman Village Stormwater Improvements
- US 441 Water Main Extension
- Dora Pines Force Main Manifold Analysis
- Dora Pines Pump Station and Force Main
- WWTP Master Pump Station Replacement
- SJRWMD Wellfield CUP Modifications
- WWTP Operation Permit Renewal
- Water and Wastewater System Master Plans
- WWTP Residual Handling System Modifications
- Sunset Circle Water Main Extension
- Downtown Alleys Rehabilitation Extension and Stormwater
System Improvements
- Traffic Impact Analysis Reviews
- GIS Mapping
- Intersection Analysis Reviews
- Lake Gertrude Drainage Basin and Feasibility Study
- Old Eustis Road Drainage Improvements
- Grantham Point Erosion Management
- Lake John Stormwater Basin Study/Design
|