DRMP was contracted to designate, locate and map all of the utilities within selected segments of the project corridor for the engineering team who was responsible for designing the new spurs, new stations, double tracks and affiliated structures necessary to accommodate the existing CSX tracks. DRMP was also contracted by WRS (Westinghouse Remedial Services) to horizontally locate any potential conflicts along a 60 + mile project corridor. In doing so, underground utility damages were prevented when soil samples were taken for an environmental assessment of the project corridor. In addition, DRMP was hired to prevent underground utility damages by locating potential conflicts horizontally for a geotechnical team taking water samples along the project corridor.